In January, 2011, shifting roof beams ruptured the sprinkler system at the Windsor High School auditorium. The seams had only been partially welded and had given out over time. The water damage has closed the auditorium since the damage, and Kaestle Boos was hired to design the repairs to the auditorium and the roof. The entire structural support system was replaced as well as the roof membrane, and inside, the seats, carpet, acoustic clouds, and finishes were renovated or replaced.
Windsor High School
Project info
- Windsor, CT
- 2012
- 7,000 SF